PDA Single Day
From Navigates Help
The PDA Date Range screen allows users to view and update allocations for a single day.
Contents |
[edit] View PDAs
To retrieve data on the PDA Date Range screen, enter the point and date and click
.
Using a respective tab, users have an option of viewing PDAs by Operator, Upstream Entity or Service Requester.
[edit] Operator Daily PDA
PDAs are grouped by Service Requester and Direction of Flow.
[edit] Upstream Entity Daily PDA
PDAs are grouped by Up/Dn Entity and Service Requester.
[edit] Service Requester Daily PDA
PDAs are listed for each activity for the point on the specified day.
Click
to clear data on the screen.
[edit] Update PDAs
To update PDA schemes:
[edit] Allocation Schemes
The following schemes can be used for predetermined allocations:
Zero - The designated nomination will not receive any volumes.
Logical - The designated nomination will be allocated a volume equal to what is scheduled.
Rank - The designated nomination will receive as much volume as available and up to its scheduled volume after all other nominations with lower rank numbers have been satisfied. Once lower ranks have been filled, any remaining volumes are placed on the higher ranked nominations.
Percentage - The designated nomination will receive the specified percentage of the total volume at the point.
Pro-rata - The designated nomination will receive a volume equal to its proportion of the total scheduled volumes at the point. Pro-Rata is technically a subset of the Percentage screen, where the percentage is determined by each nominations proportion of the total scheduled volume at the point.
Swing - The designated nomination will receive whatever is left over once every other nomination is allocated an amount equal to what is scheduled.
OBA - The designated nomination will receive whatever is left over once every other nomination is allocated an amount equal to what is scheduled. This scheme can only be applied to OBA contracts, which are held by interconnecting pipelines. OBA's are set up on receipt nominations, but the nomination can receive volumes from both directions of flow. If the net imbalance on the point is a delivery, then the volume allocated to the OBA nom will be negative (a negative receipt is a delivery).
[edit] Scheme Combinations
Acceptable/required scheme combinations are defined below:
| Schemes | Description | |
| Logical | XXX | Logical can be combined with any other scheme. |
| OBA | Logical | If OBA is assigned to one nomination, the other schemes must be logical. |
| Pro-Rata | Pro-Rata | All nominations are Pro-Rata. |
| Pro-Rata | Swing | Acceptable for the Low scheme only. The Swing nomination will take the volume left over after the Pro-rata nominations are satisfied, but only until the Swing nomination is allocated zero, at which point the pro-rata nominations will start to be allocated pro-rata. If the total volume allocated to the point is negative, the Swing nomination will get the negative allocation. |
| Percentage | Percentage | Each nomination receives the designated percentage. |
| Rank | Rank | Each nomination receives volumes in accordance with its rank. |
| Swing | Logical | The Swing nomination takes whatever is left over after the Logical nominations have all been allocated. |
| Zero | XXX | Zero can be combined with any other scheme. |
[edit] Default Allocation Schemes
Once you setup a scheme for a point, the subsequent schemes will be set by the system automatically in the following fashion:
| First Scheme | Subsequent Scheme |
|---|---|
| Logical | Logical |
| Prorata | Prorata |
| Rank | Rank |
| Percent | Percent |
| OBA | Logical |
| Swing | Logical |
| Logical/Prorata | Logical |
| Logical/Rank | Logical |
| Logical/Percent | Logical |
[edit] FIELDS
- Conf Req - Pipeline segment name.
- Preparer - Point operator.
- Contact Name - Name of the point operator's contact person.
- Contact Phone - Phone number associated with the contact person.
- Recipient Name - Pipeline segment name.
- Recipient - Pipeline segment ID.
- Stmt D/T - Date when point function was last updated to either Gathering or Transmission.
- Location - Location DRN number.
- Loc Prop - Location number.
- Loc Name - Location full name.
- Beginning Date - Nomination date.
- Dir Flo - Location direction of flow.
- Oprtg Cap - Operating capacity.
- Alloc Method Low - Allocation method used when allocated volume < scheduled volume.
- Alloc Rank Lvl Low - Allocation priority rank used when allocated volume < scheduled volume.
- Low Limit Value - Allocation limit used when allocated volume < scheduled volume.
- Alloc Method High - Allocation method used when allocated volume > scheduled volume.
- Alloc Rank Lvl High - Allocation priority rank used when allocated volume > scheduled volume.
- High Limit Value - Allocation limit used when allocated volume > scheduled volume.
- Mcf/Dth - Measurement value.
- Dir Flo - Direction of Flow.
- Up/Dn Name - Upstream/downstream business associate full name.
- Up/Dn K - Contract number associated with upstream/downstream entity.
- Svc Req Name - Name of the customer associated with the contract.
- Svc Req K - Service Requester Contract - A unique identifier issued to the contract, on which the nomination was placed.
- Package ID - Unique ID used to differentiate identical nominations.
- Sched Qty - Scheduled quantity. - Amount of gas scheduled to flow.
- Alloc Qty - Allocated quantity. - Actual allocation of gas at the point.
- Difference - Allocated quantity less scheduled quantity.
- Updated By - ID of the user or process that last updated the PDA.
- Update Date - Date the PDA was last updated.
- Act Cd - Activity Code - A unique combination of receipt and delivery locations and upstream and downstream entities.
The matrix at the bottom of the screen displays total quantities for the point for the selected date range.
| Select another PDA screen: |
|---|
| PDA Date Range • PDA Single Day |